How it works
From first visit to final handover.
Four stages, one team. Here is exactly what happens at each step, how long it takes, and what you receive — so there are no surprises between the first call and the keys.
- 01Week 1
Consult & site visit
We visit, measure, and understand exactly how you live or work.
Every project starts with a conversation at your site — not in our office. We walk the space with you, measure and photograph it, and ask about routines, storage, budget and timeline.
Within three working days you receive a short written brief that captures what we heard, a realistic budget band and a proposed scope. If it reads right, we move to design.
You receive
- —Site measurements
- —Written brief
- —Budget band & scope
- 02Weeks 2–5
Design & material palette
Concepts, 3D views and a hand-picked palette of brick, timber and stone.
We develop layouts and elevations, then 3D views of every key space. Alongside the drawings we build a physical palette — actual bricks, timber offcuts, stone and finish samples — so nothing is chosen from a screen alone.
Two rounds of revisions are included. Once you sign off, we prepare detailed working drawings and a line-item estimate.
You receive
- —Layouts & 3D renders
- —Physical material palette
- —Working drawings
- —Line-item estimate
- 03Weeks 4–8
Source & supply
We procure materials at the right price and deliver them to your site.
Because we supply materials ourselves, procurement is not a separate headache. We order from our network of kilns, mills and quarries, check quality on arrival, and phase deliveries to match the build.
You see every supplier invoice. Our margin is agreed up front and does not change with the brand you choose.
You receive
- —Scheduled deliveries
- —Quality checks
- —Transparent invoices
- 04Weeks 6–12+
Build & install
Our team executes and hands over — clean, on time and snag-free.
A dedicated site supervisor runs the programme and sends you photo updates twice a week. Carpentry is made in our workshop and installed on site to keep dust and delays down.
Before handover we walk the project with you, fix every snag on a shared list, deep-clean, and leave you with a maintenance guide for each material.
Start at step oneYou receive
- —Site supervisor
- —Twice-weekly updates
- —Snag list & handover
- —Maintenance guide
Timelines
How long does it all take?
Every project is different, but these answers cover most. More on the FAQ page.
How long does a home interior project take?
Design takes 3–5 weeks. Execution for a 2–3 BHK apartment is usually 8–12 weeks after design sign-off. We share a dated programme before work begins and update you twice a week.
How many design revisions are included?
Two full rounds at the concept stage and one at the detail stage. Beyond that, revisions are charged hourly — but in practice we rarely need them.
Will I see 3D views before anything is built?
Yes. Every key space is rendered in 3D, and we build a physical material palette so you can see and touch the actual brick, timber and stone we are proposing.
Can you work with my architect?
Happily. We often take an architect's structural plan and carry it through to a finished facade, landscape and interior.